Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9551041
- Product Categories
- Friendly Links
- home > Supply > Supply Installation Tips: How to properly install integrated ceiling? Specific steps
Information Name: | Supply Installation Tips: How to properly install integrated ceiling? Specific steps |
Published: | 2013-07-30 |
Validity: | 30 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Article taken from integrated ceiling brand (http://www.geler.net/) how to better integrate the installation of ceiling has become a major part of home improvement projects, but also to grasp the owners installed a learning process. Integrated ceiling is a metal side panels and electrical combination can be divided into heating, lighting, ventilation and other three kinds of modules, compared to the traditional ceiling, it has many advantages. That integrated ceiling on how to install, what are the relevant process methodology? Here we look at the concrete. First, the installation of a main keel, first fixed wood, corners line up the plane were measured out 30mm distance, mark the line and used as a fountain playing good horizontal strips of wood bottom line. 2 and about 40mm above the horizon where bombs horizontal and use 8mm-10mm drill holes for mounting wood, pitch is 20-30mm, hole depth of about 50mm. 3 strips of wood and then into the hole. Notice shall not be exposed wooden walls, and to do tag. 4 using conventional nail driven into a fixed good wood, ensure robustness. Second, install a hook if the main keel length exceeds 150cm, need to add a hook on the other side, installed in the proper position and make a mark. 2 electric hammer diameter 8mm, 50mm deep hole, and then determine the length of the hook, and the hook of an expansion tube inserted into a hole, tighten the nut, ensuring solid after, then hooks and main keel firmly fixed. Third, Lvkou assemble an installation Lvkou sure to bring gloves. 2 Lvkou first tear film edges, the host can start the keel begin installation, block by block assembly to the wall, patchwork gap consistent pinch the corners aligned. 3 second block Lvkou installation, the first not assembled, first other Lvkou panel assembled, we must remain flat job, without leaving a trace of the gap. 4 measure the remaining dimensions, the last one Lvkou install fixed, and then assemble the final second block Lvkou, crevice meet the overall requirements. Notice how the need to cut, after a good first cut in the installation. Details to talk about the specific steps to install integrated ceiling, we want to understand the main points in this regard to have more information and help. If you want to know more, Jiaxing Spengler integrated ceiling welcomes you to login site view http://www.geler.net/. |
Admin>>>
You are the 5163 visitor
Copyright © GuangDong ICP No. 10089450, Spengler integrated ceiling Jiaxing, Zhejiang Science and Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5163 visitor
Copyright © GuangDong ICP No. 10089450, Spengler integrated ceiling Jiaxing, Zhejiang Science and Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility